The project consists of 1000l.f. of concrete saw cutting, 20 loads of debris hauled off site, 100c.y. of concrete footings/foundation walls, 13,000s.f. of scored concrete patio, 1,000s.f. of sidewalk, 600l.f. of curb & gutter, 4000s.f. of brick paver re-installation and 4,650s.f. of rigid foam fill. The total yardage of concrete was 380c.y. |