The project consisted of 4,630 s. f. of 4”, 6”, 8” and 12” interior CMU walls, 2000 s. f. of concrete placement for plumbing trench pour-back, formwork and placement of 10 c. y. of concrete for 5 drainage pits and a 600 s. f. slab on deck for a roof top boiler room floor. The work was completed for HITT Contracting. Minor masonry and concrete demolition, as well as, installation of 17 door frames were also included in the scope of work.